An in-ground fiberglass pool represents an investment of $50,000 to $100,000, depending on its size, options, and surrounding landscaping. This budget includes the pool shell, excavation, installation, and basic equipment. To plan your project effectively, here are the factors that influence the final cost, as well as the steps to expect.
The components of an in-ground pool budget
Le prix d’une piscine en fibre de verre se divise en plusieurs postes. Comprendre cette répartition vous permettra de faire des choix éclairés.
| Budget Item | Price Range |
| MOVA Fiberglass Hull | $25,000 to $45,000 |
| Excavation and site preparation | $8,000 to $15,000 |
| Installation and hookups | $10,000 to $20,000 |
| Equipment (pump, filter, heater) | $5,000 to $15,000 |
| Landscaping (deck, fence) | $10,000 to $30,000 |
Factors that influence price
Pool size and shape
MOVA fiberglass pools are available in a variety of sizes, ranging from compact 10-foot models to large 40-foot pools. A larger pool requires more materials, more extensive excavation, and more powerful equipment.
Site conditions
Sloping terrain, rocky soil, or a high water table increase excavation costs. These conditions may require blasting, a pumping system, or retaining walls.
Site accessibility
The fiberglass shell arrives in one piece via a crane truck. If access to your yard is limited, preparatory work may be necessary to allow for delivery.
Options and finishes
LED lighting, a salt-based de-icing system, solar heating or a heat pump, and an automatic cover—each option enhances your comfort but adds to the initial budget. However, some may represent a profitable long-term investment.
The steps involved in an in-ground pool project
1. Planning and Design (4 to 8 weeks)
- Assessment of your lot and your needs
- Selection of model and options
- Application for a municipal permit
- Planning of the surrounding landscaping
2. Site preparation (1 to 2 days)
- Excavation according to the exact dimensions of the shell
- Leveling and compacting the base
- Installation of the gravel bed
3. Installation of the shell (1 day)
- Delivery and placement by crane truck
- Precise leveling of the pool shell
- Gradual backfilling with the addition of water
4. Connections and finishing touches (3 to 5 days)
- Installation of plumbing and the filtration system
- Electrical connection
- Installation of the coping and deck
- Start-up and water balancing
Why choose fiberglass?
Fiberglass offers several advantages over concrete or vinyl:
- Durability: Non-porous surface resistant to algae and stains
- Low maintenance: Fewer chemicals required
- Quick installation: A few days versus several weeks for concrete
- Comfort: Smooth surface that feels pleasant to the touch
- Warranty: MOVA shells come with a lifetime structural warranty
“A well-planned pool project is one that blends seamlessly into your yard. At 360 Fonda Pro, we always take a holistic view: drainage, ground level, walkways, and the deck. Every element is designed to harmonize with the others. ” — Pier-Olivier Grandmaison, Pool Division Manager
Plan your project now Winter is the perfect time to plan your pool project. It can take several weeks to manufacture the pool shells and obtain permits. By starting your planning early, you can ensure that your pool will be installed in the spring, so you can enjoy it as soon as the warm weather arrives.